JFK Medical Center
Edison, New Jersey
Project Architect: MRM Architecture
2009 U.S. Route 130, Suite B
North Brunswick, New Jersey 08902
732-297-4200
Client: JFK Health Systems, Inc.
Edison, New Jersey

PROJECT DESCRIPTION: A new addition
(136,000 sq.ft.) and renovation (131,000 sq.ft.) including new entrance lobby,
12 operating room suites, LDRP suite, medical surge (32) wing, Day Accommodation
Center, Admissions, lab and testing, rehabilitation Ambulatory Center,
Psychiatric Department, Social Services, Hydrotherapy, In and Out Patient Gym,
Rehabilitation Medicine, Audiology and Administration.
Two steam absorption chillers at the end of their useful life have been replaced
with two 1200 ton centrifugal chillers using environmentally acceptable
refrigerant 134A. The chilled water will serve the new building additions,
offsetting the increased heat gain generated by new equipment, and spare
capacity for future needs.
Low energy fluorescent fixtures are used throughout the hospital. Fixtures
consist of the latest electronic ballasts and energy saving lamps. A 1250 KW
emergency diesel generator will provide standby power for lighting, critical
power OR's, LDRP air cooled chillers, heating pumps and life systems.
A fire alarm multiplex addressable fire alarm system has been designed for the
new additions with a tie to the existing building systems to have a single point
of reference and alarm. A complete wet sprinkler system was provided and
included a new fire pump, jockey pump and controllers. A new stand pipe system
was installed in the new addition and all existing systems were interconnected
with the new fire pump supply.
Construction Cost: $40.0 million
Completion Date: Spring 1999